ŞİŞECAM ELYAF SANAYİ A.Ş.
PROJECT PROPERTIES
Contractor: Şişecam
Location: Balıkesir
Project Area: 7000 m2
ŞİŞECAM ELYAF SANAYİ A.Ş.
Work of wiping the bottom, dusting and the action of mechanically giving shine The low strength and weak bottom of the 7000 m2 basement concrete of the Balıkesir plant owned by Şişacam Elyaf San.A.Ş was excavated. And we got a stronger and smoother surface. Following digging, the following were applied to the concrete: dust removal, corrosion protection, mechanical shine and the bottom became more solid having an aesthetic form.